Pwd Dsr 2015-16 Maharashtra __link__ ★ Ultimate
Here is a comprehensive review and analysis of the DSR 2015-16, highlighting its structure, key changes from previous years, and its current relevance.
Example: DSR rate = ₹5000/cum. Index Mar 2026 = 160. Current estimated cost = 5000 × (160/100) = ₹8000/cum. Pwd Dsr 2015-16 Maharashtra
| Sr. No. | Description of Item | Unit | Rate (₹) | |---------|--------------------|------|-----------| | 1 | Earthwork in excavation in ordinary soil (all leads & lifts up to 50m) | cum | 135.00 | | 2 | Earthwork in hard murrum / soft rock | cum | 210.00 | | 3 | Filling available excavated earth (compacted) | cum | 85.00 | | 4 | Providing and laying cement concrete 1:4:8 (40 mm aggregate) | cum | 2,850 | | 5 | RCC 1:2:4 (20 mm aggregate) – excluding steel | cum | 4,200 | | 6 | Reinforcement steel (Fe 500) – cutting, bending, placing | MT | 48,000 | | 7 | Brick masonry in CM 1:6 (class 7.5 bricks) | cum | 3,200 | | 8 | 12 mm cement plaster 1:6 | sqm | 75.00 | | 9 | Whitewashing / color washing (two coats) | sqm | 18.00 | | 10 | Painting – enamel paint (two coats over primer) | sqm | 65.00 | | 11 | Flooring – ceramic tiles 300x300 mm (including 20 mm thick mortar) | sqm | 310.00 | Here is a comprehensive review and analysis of
This guide provides an in-depth look at what the 2015-16 DSR covers, its significance, and how it was applied across Maharashtra. What is PWD DSR 2015-16 Maharashtra? Current estimated cost = 5000 × (160/100) = ₹8000/cum
To understand the relevance of the PWD DSR 2015-16, let us examine some basic rates for a district like or Nagpur (rates are approximate and for illustration only, as actual DSR rates are more granular):
. For example, rates typically apply to the ground and first floors, with a 1% increase for every additional floor thereafter. District-Specific Tailoring : While the format is standardized by the Maharashtra PWD